Taylor’s Point Dinghy Ramp

Boat Ramp Access 1

Moodie Outdoor Products has recently completed the installation of a Dinghy Ramp at Taylor’s Point. The previous hardwood structure had been washed away during the severe storms that lashed NSW last year.

Boat Ramp Access Design

The new dinghy ramp has been designed and fully engineered by Moodie’s. Sea wall and pier footing were engineered/designed using elastoplastic concrete therefore eliminating any requirement for steel reinforcement which is prone to corrosion in a coastal environment. Roocycle ET was used in the sub-structure of the ramp and the deck was completed with non-slip FRP mini-mesh. The ramp features a slot that allows the hull of the dinghy to slide down the ramp without incurring any damage.

Boat Ramp Access 2

Roocyle ET was selected due to its non-permeable nature…meaning it will not absorb water and will therefore never rot.

If you would like to find out more about this project or any of the Boat Ramps available please do not hesitate to Contact Us today.

by Clint Moodie