Moodie Outdoor Products recently completed the installation of a Pedestrian Walkway at the Chisholm Centre in Winston Hills, NSW.

The walkway is 50 lineal metres and has been constructed at 1.8m wide to provide easy access for all. The substructure has been constructed using Roocycle ET to provide a long lasting maintenance free walkway.

FRP micromesh was used for the deck as it is non-slip and maintenance free. Black powdercoated balustrading and stainless steel handrails finish off the walkway nicely.

If you would like to discuss a similar project please get in Contact with us.

Roocycle Access Ramp

Roocycle Access Ramp 2

Moodie Outdoor Products has recently completed the installation of an access ramp to a private residence in Eastwood. Unfortunately, our client suffered an illness that left him confined to a wheelchair and a disabled access ramp was required to enable entry from the footpath to the house.

Excavation was required through the garden with the sub-floor structure hugging the ground and some retaining walls installed. Roocycle ET was the perfect structural choice as it will never be affected by termites or moisture. Roocycle Enviro decking was installed as it has the required slip rating to comply and the entire structure has engineers certification. In total, 3.9 tonnes of material was diverted from landfill in completing this project.

Roocycle Access Ramp 1

Our clients are very happy with the end result which now allows them to get out of the house with ease. If you would like to know more about this project please do not hesitate to Contact Us.

Project Completion – Corpus Christie Catholic Primary School – Roocycle Access Ramp

roocycle-et-access-ramp-corpus-1

Moodie Outdoor Products recently completed a project for Corpus Christie Catholic Primary School. The school required an ramp with disable access to join 2 x levels within the school grounds.

The ramp would also be required to retain soil as there was a garden that divided the 2 x levels. Roocycled wpc materials ticked all the boxes as the product is non-permeable, will not rot, split, crack or warp. It is manufactured from co-mingled particles of wood waste and recycled plastic.

roocycle-et-access-ramp-corpus-2

The popular combination of Roocycle ET for the structure and Enviro decking was used for the construction. Engineering certification was provided for the design and the ramp was constructed to a 1:14 gradient with level landings where required.

In total 4.8 tonnes of material was diverted from landfill to complete this project.

If you would like to find out more about this project please Contact Us today.