Project completion – Grafton 26m pedestrian bridge

Riesling steel trussed bridge installed at Clarenza path near South Grafton, NSW.

Moodie Outdoor Products has recently completed the supply and installation of a Riesling steel bridge in Grafton, NSW.

The single span bridge is 26m long with 2.5m clear width between handrails to facilitate a shared pathway for pedestrians and bicycles. The bridge is designed to 5kPa pedestrian loading with HDG (hot-dip galvanised) steel balustrade panels, cycle rail, and FRP mini-mesh decking.

Manufactured by Outside Products with factory assembly, transported by three semi-trailers, and craned into position.

All factors related to the river and its banks are taken into account when planning the bridge installation.
A crane lifts the single span bridge with careful final positioning onto the abutments.
The bridge is attached to concrete abutments.

by Neal Moodie