Project Completion – Waverley Cemetery Roocycle Arris Rail Fence

Roocycle ET Arris Fence Waverley Cemetery 1

Moodie Outdoor Products has recently completed the replacement of the fencing surrounding the Waverley Cemetery. In total there was roughly 600m of fencing that required upgrading.

Roocycle ET Arris Fence Waverley Cemetery 3

As you can see from the above photo the existing timber fence is showing its age and is rotten and sagging in most places. Council chose to replace the fence with the Moodie Roocycle Arris Rail Fence. The benefit of going with Roocycle materials is that they require no ongoing maintenance, will never rot, resistant to termite attack and are a sustainable solution. Not only that, but it looks great too!

Roocycle ET Arris Fence Waverley Cemetery 2

In total, approximately 16.5 tonnes of waste will be diverted from landfill as a result of this project.

If you would like to find out more please do not hesitate to Contact Us today.

by Clint Moodie